Installed capacity of 582.8 MW
The energy generated in Tucano is 100% clean and renewable
In operation
Installed capacity of 91 MW
The energy in Cajuína will be 100% clean and renewable
Release forecast: 2024
Installed capacity of 155 MW
Already in operation